Data as of: 2026-09-02 Administration DE EN
Plant Protection Product Search

« Indications · to the product

PIRIMOR G

Use number: 062470-00/00-001

Crops
cereals (barley, oats, rye, triticale, wheat)
Pests
aphids
Area of use
Outdoors
Field of activity
Insecticide
Application technique
spraying
Growth stage
41
Applications per crop
Applications per growing season
1
authorised until
2027-10-31

Application rates

ConditionProduct rateWater rate
TG1 200 GH 200 – 400 LH

Pre-harvest intervals

CropPre-harvest intervalRemarksexcluded
cereals (barley, oats, rye, triticale, wheat) 35 days

Timing of application

Restrictions

Code Text Crop Buffer zone
NW606 The only case in which the product may be applied without loss reducing equipment is when at least the buffer zone stated below is kept from surface waters - except only occasionally but including periodically water bearing surface waters. Violations may be punished by fines of up to 50 000 Euro. 15 m
NW605-1 When applying the product on areas adjacent to surface waters - except only occasionally but including periodically water bearing surface waters - the product must be applied with equipment which is registered in the index of 'Loss Reducing Equipment' of 14 October 1993 ('Bundesanzeiger' [Federal Gazette] No 205, p. 9780) as amended. Depending on the drift reduction classes for the equipment stated below, the following buffer zones must be kept from surface waters. In addition to the minimum buffer zone from surface waters stipulated by state law, the ban on application in or in the immediate vicinity of waters must be observed at all times for drift reduction classes marked with "*".
NG362-2 The total application rates per hectare per year, indicating the exact area shall be documented in a suitable form. The records shall be kept for a minimum period of 4 years.
NG362-1 No additional application using products which contain the active substance pirimicarb on the same area within one calendar year and the following 3 calendar years.
NW800 Application not allowed on drained areas between 1 November and 15 March.